Introduction; Connecting The Count Manual Switch - JUKI IT-10 Instruction Manual

Table of Contents

Advertisement

1. INTROdUCTION

This Instruction Manual covers IT-10 Panel Indication.
Be sure to read "Safety precautions" in the Instruction for the SC-920 (control box) before reading this Instruction
Manual to fully understand them.
IT-10 comprises of 2 panels with different functions.
The left panel is used to set up the sewing pattern. For operation procedures, please see
TERN SETUp BLOCk (LEfT
The right panel is used to measure and set up the production management data. For operation procedures,
"7. pROdUCTION MANAGEMENT dATA MEASUREMENT BLOCk (RIGHT
please see
Sewing pattern setup block
Be careful of handling this product so as not to pour water or oil, shock by dropping, and the like
since this product is a precision instrument.

2. CONNECTING THE COUNT MANUAL SwITCH

2
A
pANEL)".
Production management data measurement block
3
1
– 1 –
1) Press in the direction of arrow mark the click of
section A of cord outlet cover 2 assembled in
the rear of operation panel 1 and remove the
cover.
2) Connect optional junction cable connector to
connector CN105 3 of the count manual switch.
Note) Prepare the switch main unit by the
customers or ask JUKI business office
about it.
Optional relay cable A (asm.)
JUKI Part No. 40008168
3 2 1
CN105
+5v
1
Sw
2
GNd
3
"6. SEwING pAT-
pANEL)".

Advertisement

Table of Contents
loading

Table of Contents