Step 3 - Plugging In The Ac Power Cord; Power Failure - D-Link DXS-1210-10TS User Manual

Dxs-1210 series l2 10 gigabit ethernet switch series
Hide thumbs Also See for DXS-1210-10TS:
Table of Contents

Advertisement

D-Link DXS-1210 Series User Manual
Then, use the screws provided with the equipment rack to mount the switch in the rack.
Figure 2.3 – Mount the Switch in the rack or chassis
Step 3 – Plugging in the AC Power Cord
The Switch can now be connected to the AC power. Connect the AC power cord to the rear of the switch and
to an electrical outlet (preferably one that is grounded and surge protected).
Figure 2.4 –Plugging the switch into an outlet

Power Failure

As a precaution, the switch should be unplugged in case of power failure. When power is resumed, plug the
switch back in.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxs-1210-12tcDxs-1210-12scDxs-1210-16tc

Table of Contents