You can connect the switch to a protective ground by
following the steps below:
1. Verify if the system power is off.
2. Place the terminal lug ring of the grounding cable on
top of the ground-интерфе s crew opening, insert the grounding
screw into it and tighten the screw with a screwdriver.
3. Attach the terminal lug ring at the other end of the
grounding cable to an appropriate grounding stud or
bolt on rack where the switch is installed.
4. Verify if the connections at the ground connector on
the switch and the rack are securely attached.

Installing Power Cord Retainer*

Tp prevent accidental removal of the AC power cord, it
is recommended to install the power cord retainer*
together with the power cord.
1. With the rough side facing down, insert the tie wrap
into the hole below the power socket.
2. Plug the AC power cord into the power socket of
the switch.
3. Slide the retainer through the tie wrap until the
end of the cord.
4. Circle the tie of the retainer around the power cord
and into the locker of the retainer.
5. Fasten the tie of the retainer until the power cord
is secured.
* Not included in the package contents.
Step 3 – Plugging in the AC
Power Cord
You can connect the AC power cord into the rear
of the switch and to an electrical outlet (preferably
one that is grounded and surge protected).

Power Failure

As a precaution, the switch should be unplugged in
case of power failure. When power is resumed, plug
the switch back in.