Checklist - Stuart Turner CH 4-30 B Installation, Operation & Maintenance Instructions Manual

50 hz
Table of Contents

Advertisement

CHECKLIST

IMPORTANT: With the pump
removed from its packaging check
for any damage prior to installation.
If any damage is found contact
Stuart Turner Ltd within 24 hours of
receipt.
28 mm copper
inlet pipework
(suction).
Fig. 1
Item Description
A
Pump
B
Hose & sealing washer
C
Inlet connector & 'O'-ring
D
Anti-vibration feet
Note: Item C & G are supplied loose and will require fitting to the pump inlet/outlet.
Tighten to torque 4/5 Nm.
Your product may vary slightly from the picture above.
28 mm copper outlet pipework (discharge).
Short 28 mm copper pipe
tails to connect between
isolating valve and flexible
pipes.
for connection to a G 1 (1 " BSP)
adaptor or fitting.
E
28 mm isolating valve
(non restrictive) and
fittings (not supplied)
must be fitted to allow
easy pump service.
Qty Item Description
1
2
1
5
- 4 -
28 mm flexible
pipes. These
hoses are fitted
with G 1 female
connector suitable
F
C
B
Note: This image is for reference only.
E
Inline strainer
F
Pressure vessel
G
Outlet connector & 'O'-ring
28 mm isolating valve
(non restrictive) and
fittings (not supplied)
to allow easy pump
service.
28 mm - G 1 connector
(not supplied) must
be fitted
B
G
A
D
Qty
1
1
1
Cont ...

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents