Mounting
When carrying out any work on the machine, observe the general safety instructions
(Page 15) and the specifications contained in EN 50110‑1 regarding safe operation of electrical
equipment.
Note
Loss of conformity with European directives
In the delivery state, the machine corresponds to the requirements of the European directives.
Unauthorized changes or modifications to the machine lead to the loss of conformity with
European directives and the loss of warranty.
5.1

Preparing for installation

5.1.1
Requirements for installation
The following requirements must be satisfied prior to starting installation work:
● Staff have access to the operating and installation instructions.
● The machine is unpacked and ready for mounting at the installation location.
NOTICE
High temperatures
The motor components get very hot during operation. High temperatures can damage
mounting parts such as the cable insulation.
● Temperature-sensitive parts such as normal cables or electronic components must not
● Only use heat-resistant mounting parts. The connecting cables and cable entries must be
SIMOTICS M-1PH8 1PH818., 1PH822., 1PH828.
Operating Instructions 10/2017
Note
Measure the insulation resistance of the winding before starting installation work
Wherever possible, measure the insulation resistance of the winding before starting
installation work. If the insulation resistance lies below the specified value, take appropriate
remedial measures. These remedial measures may necessitate the machine being
removed again and transported.
rest against or be attached to mounted machine parts.
suitable for the ambient temperature.