K3G250-RR17-M9
Siemens AG PD LD Nbg.
With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.
; Use the device in accordance with its degree of protection.
Information on surface quality
The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. This does not however in any way affect the
technical properties of the products. The product is to be protected against
UV radiation to prevent the formation of patches and fading. Changes in
color are not a reason for complaint and are not covered by the warranty.
3.5 Mounting data
; Secure the screws against unintentional loosening (e.g. use self-
locking screws).
Strength class of
8.8
screws
Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.
3.6 Transport and storage conditions
Max. permitted
+80 °C
ambient temp. for
motor (transport/
storage)
Min. permitted
-40 °C
ambient temp. for
motor (transport/
storage)
3.7 Electromagnetic compatibility
EMC immunity to
According to EN 61000-6-2 (industrial
interference
environment)
EMC circuit feedback
According to EN 61000-3-2/3
EMC interference
According to EN 61000-6-3 (household
emission
environment)
If several devices are switched in parallel on the supply side
so that the line current of the arrangement is in the range of 16-
75 A, then this arrangement conforms to IEC 61000-3-12
provided that the short-circuit power S
of the customer system to the public power system is greater
than or equal to 120 times the rated output of the arrangement.
It is the responsibility of the installation engineer or operator/
owner of the device to ensure, if necessary after consultation
with the network operator, that this device is only connected to
a connection point with a S
to 120 times the rated output of the arrangement.
286
Item no. 55701-5-9970 · ENU · Change 94618 · Approved 2017-06-12 · Page 6 / 12
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com
Operating instructions
at the connection point
sc
value that is greater than or equal
sc
4. CONNECTION AND STARTUP
4.1 Mechanical connection
CAUTION
Risk of cutting and crushing when removing device
from packaging
→ Carefully remove the device from the packaging by grasping
hold of the frame. Never subject to any impact.
→ Wear safety shoes and cut-resistant safety gloves.
CAUTION
Heavy load when unpacking device
Risk of physical injury, such as back injuries.
→ Two people should work together to remove the device from
its packaging.
NOTE
Damage to the device from vibration
Bearing damage, shorter service life
→ The fan must not be subjected to force or excessive vibration
from sections of the installation. #If the fan is connected to air
ducts, the connection should be isolated from vibration, e.g.
using compensators or similar elements. #Ensure stress-free
attachment of the fan to the substructure.
; The fan may not be handled in the area around the inlet nozzle during
transport and installation.
There is a risk of damage to the impeller.
; Check the device for transport damage. Damaged devices are not to
be installed.
; Install the undamaged device in accordance with your application.
CAUTION
Possible damage to the device
If the device slips during installation, serious damage can result.
→ Ensure that the device is securely positioned at its place of
installation until all fastening screws have been tightened.
The fan must not be strained on fastening.
4.2 Electrical connection
DANGER
Voltage on the device
Electric shock
→ Always connect a protective earth first.
→ Check the protective earth.
DANGER
Faulty insulation
Risk of fatal injury from electric shock
→ Use only cables that meet the specified installation
regulations for voltage, current, insulation material, capacity,
etc.
→ Route cables so that they cannot be touched by any
rotating parts.