Framing & Finishing - Regency Fireplace Products Greenfire GFi350LNG-R Owners & Installation

Gas inbuilt fireplaces
Table of Contents

Advertisement

FRAMING & FINISHING
WHEN USING THE ZERO CLEARANCE BOX
1.
Frame in the enclosure for the unit with framing material.
Note: When constructing the framed opening, please ensure there
is access to install the gas lines when the unit is installed.
2. The unit does not have to be completely enclosed in a chase. You
must maintain clearances from the vent to combustible materials: See
"Clearances" section. Combustible materials can be laid against the
side and back standoffs and the stove base.
3. Finishing material may be brought to the side and top of the framing.
do not bring combustible material beyond the framed opening. This is
both for safety and servicing of the appliance.
Framed Opening
Regency GFi350L Gas Fireplace Inbuilt
Finished Wall
800mm
installation
Unit shown with Fascia
13

Advertisement

Table of Contents
loading

Table of Contents