1.) Check tubing connections to ensure correct installation set up.
2.) Check to ensure collet colors are in the correct configuration.
3.) Check to ensure jack screw is in the "up" position unless an air charge tank is being used.
4.) Ensure there is a minimum feed pressure of 35 psi.
5.) Ensure a full 3/8 inlet valve is used.
6.) Ensure system has been sanitized and air is purged from the system.
7.) Check TDS vs. feed pressure. Ensure there is a minimum of 20 psi above osmotic
pressure.
TDS
Osmotic pressure
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
* System working pressure must be 20 psi greater than the osmotic pressure
** System must meet a minimum feed pressure of 35 psi
100 ppm TDS = 1 psi of osmotic pressure
1000 ppm TDS = 10 psi osmotic pressure
Revised: 09/2016
Minimum feed pressure required
2.5
5
7.5
10
12.5
15
17.5
20
22.5
25
27.5
30
Drinking Water Systems
Page 53
K5 Drinking Water Station
35
35
35
35
35
35
37.5
40
42.5
45
47.5
50
Working pressure
32.5
30
27.5
25
22.5
20
20
20
20
20
20
20
Section 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents