▼ Unpack the Modular System
♦
Unpack your modular system and any additional modules purchased for your modular system.
The following items are included with the modular system:
Sun Netra 6000 AC modular system (chassis)
■
Four power cords
■
Rackmount kit containing rack rails and installation instructions
■
(Optional) Dongle kit, including I/O dongle and DB-9 to RJ-45 adapter for server module connections
■
▼ Mount the Modular System in a Rack
1. Prepare the rack for the modular system.
Refer to the installation guide and the instructions provided with the rackmount kit to prepare the rack for
this 8U chassis.
2. Based on the method you plan to use to lift the chassis, perform one of the following actions:
Use a mechanical lift – Do not depopulate the chassis before installing it into the rack. Go to
■
Manually lift the chassis – Before lifting, remove the items shown in the following illustration: Power
■
supplies (1), fans (2), NEMs (3), CMM (4), and PCI EMs (5). If present, remove any server modules,
storage modules, or filler panels (not shown). Note the location of NEMs and PCI EMs so you can return
them to their original location.
Step
3.
Note – When removing
modules, make sure to sup-
port the weight of the mod-
ule with your hand as soon
as you have pulled it out far
enough. This is especially
important for the power
supply modules.
DO NOT use the module
handles to pull the modules
all the way out of the sys-
tem.
Refer to the service card
attached to the chassis or
the Sun Blade 6000 Modular
System Installation Guide for
more details on removing
and reinstalling the mod-
ules.
Use at least two people to
manually lift the chassis.
2
Need help?
Do you have a question about the Netra 6000 and is the answer not in the manual?
Questions and answers