Eaton Powerware BladeUPS none User Manual page 21

Extended battery module (ebm)
Hide thumbs Also See for Powerware BladeUPS none:
Table of Contents

Advertisement

4.
Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 4 and Figure 5).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
7 holes above the last installed screw.
EATON Powerware
®
BladeUPS
®
EBM User's Guide
Position 13
Position 11
Position 4
Position 2
Figure 4. Rear Rail Screw Positions for the EBM
Figure 5. Securing the Rear Rail
S
164201650 Rev 2 www.powerware.com
INSTALLATION
Second Rail
First Rail
Clip Nuts
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents