Wiring Diagram; Preliminary Checks - RED TECNIKA 28 Use And Installation Manual

Table of Contents

Advertisement

red
 
6.3.1

Wiring diagram

The wiring diagram of the "Tecnika" hot water wood gasification boiler is shown in Figure 6.2.1
 
~
220 V 
 
1  
2  
3  
PE    

Preliminary checks

The first start-up must be performed by professionally qualified personnel.
RED will not be held liable for any damage to persons, animals or property
caused by failure to observe the above instructions.
Start-up procedures
 
USE AND INSTALLATION MANUAL
FS1 
10A 
Alarm thermostat 
0
– 95
L1 
STh  
Ambient thermostat
OPTION 
thermostat
Combustion
Flue gas  
gas
FTh2 
Flue gas 
Combustion
gas
thermostat  
thermostat
HL2 
5  
Alarm ‐ cleaning 
TECNIKA 28-35
HL3 
Overheating 
N
7  
Room thermostat 
8  
BTh  
Operating 
Operation
thermostat 
SB2  
START  
FTh1 
 
4  
Ì1
~1 
5
Flue gas fan  
Technical dept. - All rights reserved - Reproduction prohibited
Chapter
SB1 
HL1 
START indicator 
6
page 33