Section 5 - Procedures
9.
Reprogram the Tilt Switch
a.
P r e s s a n d h o l d
the set up button
f o r 3 s e c o n d s .
Results: Both LEDs
will be OFF.
b.
Both LEDs will flash.
IMPORTANT
Step "c" must be completed within
a 5 second period, or the switch will
automatically exit program mode and
return to normal operation using previously
stored data.
c.
Press and release set up button 3 times.
d.
If 5 second period has expired prior
completion, repeat Step "a", "b" and "c".
e.
O b s e r v e p r o g r a m
delay / stabilization
time. (Only the red
LED will blink for 4
seconds)
f.
B o t h
L E D s
flash for 1 second.
Results: The switch is
learning the new zero
position.
g.
Both LEDs will turn
on solid for 1 second.
R e s u l t s : T h e n e w
zero position has been
learned.
h.
The green LED will flash and then the
red LED will turn on solid for 2 seconds.
Red LED
Green LED
Results: The switch is verifying the new
zero position.
SJIII DC Electric
SJIII 3220 SJIII 3226 SJIII 4620 SJIII 4626 SJIII 4632
157935
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
w i l l
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
Service and Maintenance
i.
T h e
g r e e n
w i l l t u r n o n s o l i d .
Results: The switch
is ready for normal
operation.
10.
Turn main disconnect switch to "
11.
Remove jumper wire between #7 and #19 from
terminal block.
12.
Reattach all wires #02 to motor contactor.
13.
Reinstall any covers that was removed.
14.
Remove chock or wheel blocks.
15.
Proceed to Test and Verify Tilt Circuit.
L E D
Red LED
Green LED
" off position.
SKYJACK, Page 9