Skyjack SJIII 3220 Service Manual page 90

Dc electric scissors
Hide thumbs Also See for SJIII 3220:
Table of Contents

Advertisement

Service and Maintenance
15.
Remove jumper wire between #7 and #19 from
terminal block.
16.
Reattach all wires #02 to motor contactor.
17.
Reinstall any covers that was removed.
18.
Remove chock or wheel blocks.
19.
Proceed to Test and Verify Tilt Circuit.
SKYJACK, Page 8
Reprogramming Existing Tilt Switch
Set up button is located on this
Light Indicators
1.
Ensure aerial platform is parked on a firm level
surface.
2.
Chock or block wheels to keep the aerial platform
from rolling forward or backward.
3.
Lower/Raise the platform and secure the scissors
using the maintenance bar. (Refer to Operating
manual for Maintenance Support Procedure)
NOTE
The tilt circuit is only powered when
activating a function.
4.
Remove any covers to locate and view the tilt
switch.
5.
Disconnect all wires #02 from motor contactor.
6.
Install jumper wire between #7 and #19 to
terminal strip.
7.
Turn main disconnect switch to " " ON position.
8.
Verify switch is powered. (Red or green LED will
be continually blinking)
Red LED
Green LED
SJIII 3220 SJIII 3226 SJIII 4620 SJIII 4626 SJIII 4632
Section 5 - Procedures
face next to harness
Red LED
Green LED
SJIII DC Electric
157935

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sjiii 4620Sjiii 4626Sjiii 3226Sjiii 4632

Table of Contents