Electrical System - Homa SaniQ cut Instruction Manual

50 hz
Hide thumbs Also See for SaniQ cut:
Table of Contents

Advertisement

Available languages

Available languages

To connect the pressure line, proceed as follows:
Lay the pressure line continuously rising (ideally first vertically, then horizontally) in a loop above the level of the
backflow level of the public sewer.
This prevents sewage from being pushed back into the lifting system's container through the pressure line, in the
event of an increase in the water level in the sewer, e.g. due to heavy rain. Run the pressure line directly to the
next collecting runoff. Check all joints and connections again for tightness.
A freezing of the pressure line must be prevented. It is advisable to insulate the entire pressure line sufficiently.
According to DIN, all connected sanitation facilities must be located in the same room as the system.
5.3. Electrics
Risk of electrocution!
Improper use of electricity can be fatal! All pumps with free cable ends must be connected by a qualified
electrician.
A professional inspection prior to initial operation must ensure that the required electrical
protection measures exist. Grounding, zeroing, isolating transformer, fault current or earth leakage circuit
breaker must comply with the regulations of the responsible power station.
To connect the pressure line, use a clamp to attach the DN
25-pressure line at the pipe fitting, located at the top right
side of the container of the lifting system.
34