2.2 Connecting the rail sections with a section bush

2.3 Installing the feeder cable

1. Tighten (loosely) the four socket-head screws
in the section bush so that the four nuts are
trapped in the slot on the inner surface.
2. Fit the section bush in the end of a rail
section and adjust it to the correct position.
3. Lock the section bush by tightening the first
socket-head bolt (do not over-tighten).
4. Slide the other rail section over the section
bush and make sure that the two sections
mate properly.
5. Position a locking pin in the uppermost hole
in the rail section.
6. Push the locking pin using a welding clamp
or adjustable wrench into the rack.
1. Pull the two-core feeder cable with a cable
puller through the rail section tube.
2. Pull the feeder cable through the opening in
the flange for the charging contacts. Ensure
that the length through the rail hole L is
approximately 20 cm.
NOTE
A rail section with a parking point will be
fitted with an extra bracket with a feed-
through opening. The two-conductor feeder
cable must also be fed to this.