Preparations; At The Branch; At The Customer's Home - ThyssenKrupp Flow2A Installation Manual

Chairlift
Table of Contents

Advertisement

1 Preparations

1.1

At the branch

Check using the installation drawings and the shipping receipt whether all the required parts of the
drive unit are present and undamaged, especially:
Consult the installation drawing and the bill of materials to check:
the colour of the rail.
the type and colour of the upholstery.

1.2 At the customer's home

Inspect the area in which you plan to install the stairlift to verify that all the necessary and
agreed structural alterations have been carried out. If these alterations have not been carried
out, then you should consult the Chief Engineer or the Service Manager.
Inspect the area where you plan to install the drive unit for damage. Inform the customer of
any damage you find, and make a note on the requisite form. Have the customer sign the
form.
To ensure that you will be able to work without having to wait, you will need to go through all
the points for which you need information from the customer, i.e.:
o What is the best position for the transformer?
o What is the best place for the call and park units?
o Is there anything that you will need to remove or relocate (such as a painting, or a hat
rack)?
o
Are there any structural points you will need to take into account?
NOTE
 Give the
customer
The rail sections and
the section bushes.
The drive unit.
the user's manual to read right away.
4
The chair base with
control unit.
Various loose
components, such
as: call and park
units with joysticks,
transformer, flash
card, two-core power
cable, charging
contacts, rail
brackets with fixing
materials and an
installation drawing.

Advertisement

Table of Contents
loading

Table of Contents