Putting Into Operation; Burner Start; Burner's Assembly To Orligno 100; Adjustment Of Orligno 100 To Work With Pellet Burner - Orlanski ORLIGNO 100 16kW User And Service Manual

Table of Contents

Advertisement

5. Putting into operation

5.1. Burner start

First startup of the burner must be done by authorized company trained by manufacturer with valid
certificate of authorized serviceman issued by Eko-Vimar Orlanski ltd.

5.2. Burner's assembly to ORLIGNO 100

1. Remove the screws (1) and side screws (3) fastened to burner's casing and take off burner's casing
(2).
2. Take off ORLIGNO 100 bottom door.
3. Fix adapter (4) in bottom's door place.
4. Fix burner (5) onto adapter's screws (6), block with nuts.
5. Mount burner's casing (2) and fix it with screws (1) and side screws (3).
6. Slide feeder's pipe (7) into fixing pipe (8) (pic.6)
7. Fit flexible pipe (9) on feeder's pipe (7) and secure with band clip (10).
8. Fit metal connector (12) into burner's pipe (11).
9. Fit flexible pipe (9) onto metal connector (12) and secure it with band clip (10).

5.3. Adjustment of ORLIGNO 100 to work with pellet burner

1. Remove iron-cast grate from boiler.
2. Place two refractory bricks on each of two supports above support for iron-cast grate.
- two bottom bricks push to front,
- two upper bricks push to back .
Pic.4. Disassembly of burner's casing.
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orligno 100 24kwOrligno 100 49kw

Table of Contents