Cable Connections - Samsung DECT 500 Installation And Programming Manual

Table of Contents

Advertisement

Part 2: DECT Hardware Installation and Programming
6. Replace the top cover.
7. Connect the RFPs or the PBX extension lines to the DP 25 connectors.
8. Power up the CCFP.
If the RFPs are installed, make a cable measurement.

Cable Connections

RFPs (Base Stations)
D-Sub Pin
Cable Colour
No.
1
WHITE/BLUE
14
BLUE/WHITE
2
WHITE/ORANGE
15
ORANGE/WHITE
3
WHITE/GREEN
16
GREEN/WHITE
4
WHITE/BROWN
17
BROWN/WHITE
5
WHITE/SLATE
18
SLATE/WHITE
6
RED/BLUE
19
BLUE/RED
7
RED/ORANGE
20
ORANGE/RED
8
RED/GREEN
21
GREEN/RED
9
RED/BROWN
22
BROWN/RED
10
RED/SLATE
23
SLATE/RED
11
BLACK/BLUE
24
BLUE/BLACK
12
BLACK/ORANGE
25
ORANGE/BLACK
Base
Base
Conn 0
Conn 1
0A
8A
0B
8B
1A
9A
1B
9B
2A
10A
2B
10B
3A
11A
3B
11B
4A
12A
4B
12B
5A
13A
5B
13B
6A
14A
6B
14B
7A
15A
7B
15B
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
NC
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dect 1500

Table of Contents