Dect Survey Report Form - Samsung DECT 500 Installation And Programming Manual

Table of Contents

Advertisement

DECT Survey Report Form

Number:
From : [Survey Engineer]
To : [Customer Installation Engineer]
1. SITE
[full address of site]
2. Survey Engineers
[name and addresses of engineer(s) who executed the survey]
3. Outline description of site
[short description of site (dimensions, environment, number and type of
buildings, etc)]
4. Number of handsets and expected traffic
[description of expected traffic and indication of above- or below-
average traffic areas]
5. Test results
[this should include the site maps and any additional information that
may be useful]
6. Connections to Base Stations
[list of planned Base Stations with approximate cable length and
type, and whether existing wiring can be used or new cabling is re-
quired]
7. Type and location of keyphone system
[description, location and system configuration]
8. Existing cabling
[indicate what cabling is available and how it is distributed across the
site]
9. Base Station installation
[for each Base Station, indicate exactly where it can be installed, e.g.
"in the corridor against the wall of room 32, 2.5m high" and where
customer restrictions apply as to where Base Stations may be in-
stalled]
10. Possible configurations
[list alternative configurations for the deployment of Base Stations—
refer to coverage maps and indicate areas where coverage cannot
be guaranteed]
Part 1: Site Survey and Overview of DECT Systems
Date:
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dect 1500

Table of Contents