Samsung DECT 500 Installation And Programming Manual page 36

Table of Contents

Advertisement

Installation
First determine where to install the RFP to have the correct coverage. The average
coverage within buildings is 75 metres. Coverage depends on the construction of the
building, the architecture and choice of buildings materials. You must use the DECT
Demonstration and Installation Kit to optimize your installation. This deployment tool
consists of an RFP which has no need for a CCFP. It can easily be moved around in
the building and one to eight handsets can be connected.
1.
Pull the a/b wire from your installation through the wall holder and then mount
the wall holder on the wall.
2.
Connect the a/b wire to the plug on the back of the RFP. Use pins 3 and 4 on
the RJ-11 connector.
3.
Ensure the RFP is the right way up and "click" it onto the wall holder.
If you need to remove the base station, separate it from the wall holder with a gentle
push of a screwdriver.
Part 2: DECT Hardware Installation and Programming
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dect 1500

Table of Contents