Fronius AccuPocket 150/400 Operating Instructions Manual page 34

Rod electrode power source
Hide thumbs Also See for AccuPocket 150/400:
Table of Contents

Advertisement

Downslope:
The downslope time t
is 0.5 seconds and cannot be adjusted.
down
Gas post-flow:
The gas post-flow is carried out manually in standard versions and can be altered in the
Setup menu via the "GPo" value in TIG versions.
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents