Fronius Primo 3.0-1 Service Manual page 115

Grid-connected inverter
Table of Contents

Advertisement

Available languages

Available languages

b)
(2) (2)
(3)
Installation
IMPORTANT! The sealing foam will only be
positioned correctly and create an effective
seal if the procedure a) - b) below is follo-
wed.
a)
Attach the power stage set cover to the
2
fastener at the top and, while keeping
the power stage set cover at an angle,
pull it downwards a) and - under tensi-
on - pivot it onto the base shell b).
IMPORTANT! When closing the cover,
make sure that the springs on the keys en-
gage in the guides.
Secure the power stage set cover (3)
3
using four 5x18 mm TX25 screws (2)
with seal rings
(2)(2)
Tightening torque = 2.5 Nm
NOTE! If the thread of these
screws is rotating and the screws
no longer engage, use the follow-
ing screws:
PT 5x25 mm T25 KT25
(item number 42,0401,4231)
Attach the inverter to the wall bracket
4
at the top at a maximum angle of 11°
and push it towards the wall bracket
115

Advertisement

Chapters

Table of Contents
loading

Table of Contents