Done By Authorized Mutoh Technician; Periodical Replacement Of Parts; Periodical Inspection Part List - MUTOH ValueJet VJ-1604 Operation Instructions Manual

Eco-solvent ultra printer
Hide thumbs Also See for ValueJet VJ-1604:
Table of Contents

Advertisement

4.2 DONE BY AUTHORIZED MUTOH TECHNICIAN

This section describes the periodical part replacement and the periodical inspections required for this printer.
These periodical services ensure the stable printing quality of the printer.

4.2.1 Periodical replacement of parts

Perform periodical replacements according to the table below. These replacements should be executed by
an authorized Mutoh technician. These replacements are necessary to ensure the best printing quality
output.

4.2.2 Periodical inspection part list

Perform periodical inspections according to the table: "Periodical Inspection Part List" and perform cleaning
and part replacement as necessary.
Media guide
Sub platen front surface
Timing fence
(CR encoder detection slit plate)
Rail on the CR guide frame
P_REAR sensor front surface
Part
Maintenance station
Wiper
Damper
Part
Timing
Once a year
Once a year
Once a year
Timing
Once a year
Once a year
Once a year
Once a year
59
Operation Instructions VJ-1604
Check point
Media dust accumulation
Foreign objects
Damages
Media dust accumulation
Foreign objects
Damages
Foreign objects
Media dust accumulation
Foreign object
AP-75769 - Revision 1.0 –2/04/2007
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents