Installation
2.3.

Assembly

WARNING
Locate the plastic bag that contains the Owner's Manual and
the 90 Series Hardware Kit.
• 90 Series Hardware Kit contains:
• Medical Rail Hardware: The medical rail hardware is
attached to the medical rail: (2x) 5/16" bolts and (2x) 5/16"
lock washers (Figure 2-6).
• Frame Hardware: Frame hardware, (4x) 1/4x20 self-tapping
screws are started in the frame at the appropriate mounting
points (Figure 2-6).

2.3.1. Base Assembly Instructions

1. Position the base where the treadmill is to be located:
Do not remove the wire tie protruding from Upright Center
Note:
Hole on upright. You will need this to guide the upper wire
harness down through the upright in "Plastic Bridge
Installation" on page 30.
24
Failure to leave ample clearance at the rear of the
treadmill could result in the user becoming trapped
between the treadmill and the wall should the user
accidentally trip and fall while exercising.
Handrail screws-12x
Console screws-4x
Cup holder screws-6x
Allow a minimum clearance of 18 inches (46 cm) on
each side of the treadmill.
Allow a minimum clearance of 6 feet (183 cm) at the
rear of the treadmill.