Siemens 7SR12 Argus Manual page 402

Overcurrent relay energy management
Hide thumbs Also See for 7SR12 Argus:
Table of Contents

Advertisement

7SR11 & 7SR12 Applications Guide
Scheme 2 (Intermediate)
+
R
Scheme 2 provides continuous Trip Circuit Supervision of trip coil with the circuit breaker Open or Closed. It does
not provide pre-closing supervision of the connections and links between the tripping contacts and the circuit
breaker and may not therefore be suitable for some circuits which include an isolating link.
Scheme 3 (Comprehensive)
+
R
R
Scheme 3 provides full Trip supervision with the circuit breaker Open or Closed.
Page 46 of 48
BO
TRIP CCT n FAIL
BI
+ve
-ve
BO 1
BO n
Remote
Alarm
Figure 5.4-2 Trip Circuit Supervision Scheme 2 (H6)
BO
TRIP CCT n FAIL
BI
+ve
-ve
BI
+ve
-ve
BO 1
BO n
Remote
Alarm
Figure 5.4-3 Trip Circuit Supervision Scheme 3 (H7)
52a
TRIP COIL
52a
Circuit
Breaker
52b
H6 Scheme Notes:
BI = 19V (30, 48, 110, 220V supply)
BI = 88V (110, 220V supply)
R = 3K3 typical
52a
TRIP COIL
Circuit
Breaker
52b
H7 Scheme Notes:
BI = 19V (48, 110, 220V supply)
R = 3K3 typical
©2017 Siemens Protection Devices Limited
-
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7sr11 argus

Table of Contents