Basic Troubleshooting2 - NEC Aspila EX Hardware Manual

Hide thumbs Also See for Aspila EX:
Table of Contents

Advertisement

CÔNG TY VIỄN THÔNG VIỆT PRO
Section 2: PCB Installation and Startup
Basic Troubleshooting
To troubleshoot extensions:
1.
2.
3.
4.
5.
6.
7.
8.
9.
To troubleshoot lines:
1.
2.
3.
4.
5.
6.
7.
8.
9.
2-54
Section 2: PCB Installation and Startup
Chuyên phân phối tổng đài NEC
Verify the Run/Block switch is set in the RUN position for the PCB.
Check and verify extension. The ESIU PCB has test points located on the top edge of the
PCB.
The voltages at the extension's modular jack should be:
Test Point
TP3 - TP2
TP1 - TP2
Check and verify the phone is working correctly by connecting it to another extension.
Check and verify programming. Refer to the Software Manual if necessary.
Check and verify extension wiring.
Check and verify cable connection of the EXIFU if two cabinets are used.
Check and verify the correct LED indication on the PCB.
Check and verify extension PCB installation.
Verify the Run/Block switch is set in the RUN position for the PCB.
Check and verify each line before the system with a test set.
Measure loop current on each line with a digital voltmeter.
Check and verify programming. Refer to the Software Manual if necessary.
Check and verify trunk wiring.
Check and verify cable connection of the EXIFU if two cabinets are used.
Check and verify the correct LED indication on the PCB.
Check and verify trunk PCB installation.
Check and verify the proper earth grounding is made for the system.
Voltages
-54 to -47V DC
+3.3 to +3.5V DC
Aspila EX Hardware Man-
http://vietpro.com.vn

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents