Switch Installation
Installing the Switch
Figure 14
Rack-Mounting
After the switch is mounted in the rack:
1.
Wire the switch to a power source. See
2.
Connect the ports. See
3.
Attach the cable guide to prevent the cables from obscuring the LED panels on the devices in the rack. Use the
supplied black screw to attach the cable guide to the left or right bracket.
For configuration instructions about the CLI setup program, go to
page
57.
Wall-Mounting
To wall-mount the switch, follow the steps in these sections:
Attaching Brackets, page 23
Attaching Brackets for IP-30 Compliance (Optional), page 24
Wall-Mounting the Switch, page 24
Warning:
Read the wall-mounting instructions carefully before beginning installation. Failure to use the correct
hardware or to follow the correct procedures could result in a hazardous situation to people and damage to the
system. Statement 378
Warning:
For mounting railway-application equipment and for EN50155 standard compliance, the switch must be
installed only in a rack mid-mounting position. If you install the switch in a front rack-mounting (cable side or power
supply side) position or in a wall-mounting position, a mechanical failure can occur that results in the switch
becoming detached from the rack. Statement 403
If the switch is wall-mounted in an enclosure, follow these minimum clearances:
Sides of switch (facing up and facing down): 3.75 in. (9.52 cm)
Port side 3.0 in. (7.62 cm)
Power supply side: 5.25 in. (13.33 cm)
Cover side (not facing wall): 1.75 in. (4.44 cm)
Wiring the Power Source, page
Connecting Devices to the Ethernet Ports, page
39.
31.
Configuring the Switch with the CLI Setup Program,
22