Maintenance; Maintenance And Inspection - NAMCO TIME CRISIS 2 Operation Manual

Table of Contents

Advertisement

8.

MAINTENANCE

8. MAINTENANCE
.
Before performing maintenance (such as troubleshooting and repairs), always turn off the power switch
to prevent service people and other persons around them from getting an electric shock, accident, or
injury.
.
Some parts in the projector retain high heat and voltage after power-off. These may give you an electric
shock or get you burned. Therefore take enough care not to touch any of them.
l
Do not forget to conduct periodic inspection.
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents