6000 Series Purge/Pressurization System

Component kit installation

User interface
Panel mount (internal mount, for hazardous
area installation, NOT to be used in
Dust, Class II/Zone 21 areas)
Mounting bracket
Mount the explosion-proof enclosure and valve as
desired. Follow all applicable electrical codes when
required.
When installing panel mount configuration, the
installation must be evaluated for Type 4x rating
by a third party NRTL authorized
Note
certification agency.
Gasket (provided)
User interface
(provided)
Use a crisscross pattern to tighten the
screws for the UIC bracket. Tighten bolts
Note
3 to 4 in-lb (0.4 Nm). For a good seal,
ensure that the bracket bottoms out on
the enclosure.
Customer's
enclosure
Cutout
3.40" x 3.40"
86 mm x 86 mm
1" #6-32 standoff
Enclosure must be made of metal and grounded.
Warning
Cutout must be no larger than dimensions
specified in above drawing.
Warning
The user interface must be mounted inside the
pressurized enclosure to maintain the
Note
environmental ratings.
I/O Manual
21