ABB REQ650 Applications Manual page 81

Breaker protection
Hide thumbs Also See for REQ650:
Table of Contents

Advertisement

1MRK 505 291-UEN A
13.8
kV
120
V
IEC11000032 V1 EN
Figure 31:
A Phase-to-phase connected VT
Application manual
L1
L2
L3
1
Where:
1)
shows how to connect the secondary side of a phase-to-phase VT to the VT inputs on the IED
2)
is the TRM or AIM where this voltage input is located. The following setting values shall be
entered:
VTprim =13.8 kV
VTsec =120 V
3)
are three connections, which connects these three voltage inputs to three input channels of
the preprocessing function block 4). Depending on the type of functions, which need this
voltage information, more than one preprocessing block might be connected in parallel to
these three VT inputs
4)
Preprocessing block has a task to digitally filter the connected analog inputs and calculate:
fundamental frequency phasors for all four input channels
harmonic content for all four input channels
positive, negative and zero sequence quantities by using the fundamental frequency
phasors for the first three input channels (channel one taken as reference for sequence
quantities)
These calculated values are then available for all built-in protection and control functions
within the IED, which are connected to this preprocessing function block. For this application
most of the preprocessing settings can be left to the default values. However the following
settings shall be set as shown here:
ConnectionType = Ph-Ph
UBase=13.8 kV
If frequency tracking and compensation is required (this feature is typically required only for
IEDs installed in the generating stations) then the setting parameters
set accordingly.
IED
3
2
Section 4
Analog inputs
4
SMAI_20
IEC11000032-1-en.vsd
DFTReference shall be