Nailor BAC-8001-36 Installation And Operation Manual page 27

Ezvav series
Table of Contents

Advertisement

The airflow balancing procedure (continue)
PROCEDURE
8 Advance or exit.
Date: 10-2016
Supersedes: 7-2016
Nailor reserves the right to change any information concerning product or specification without notice or obligation.
Installation and Operation Manual
1. Press the
or
following:
• PRI to balance the primary VAV for dual duct
systems
• BACK to choose another configuration function.
• EXIT to return to the temperature display.
2. Press the
button to select the next function.
Page 27 of 48
EZvav Digital Controls
STEPS
buttons to select one of the
STE DISPLAY
SEC
IOM-EZVAVINST

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bac-8005-36Tsp-8001-36Bac-8007-36

Table of Contents