Maintenance, Care, Sweeping ..........20-21 Advice about Fuel Pellets ...............22 Maintenance contract Guarantee ..................22 Ariterm recommends the boiler installation to be made by a company with professio- Storage Planning ................22 nal competence. For more information please contact your Ariterm retailer. Feeding System .................23-26 Replacing of spare parts Manufactures Declaration .............27...
DIMENSIONS / ITEMS INCLUDED IN THE DELIVERY / TECHNICAL DATA - BIOMATIC+ 20 Part Number Ø102 • Biomatic+ 20 ( part.no. 4010) Standard delivery • Shunt valve ESBE TM 20 • Sweeping gear • Combination flue for horizontal and vertical installation ( part no.
Page 4
400 V 50 Hz Supply cable MMJ 4x2,5s 12. Air valve Electrical data A-dimensions including comb.flue pipe is app. 2000 mm Fuse size 3x16 A 13. Ash compression Power in operation 9000 W ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 4/32...
OPERATING PRINCIPLE Small dimensions for easy installation Biomatic+ 20/30 the new generation pellet boiler is equipped with a 20/30 kW built- in pellet burner. A pellet burner has many similarities with an oil burner. The dif- Thanks to its modest dimensions Biomatic+ 20/30 can be installed in boiler rooms ference is that heating with solid fuel produces ash that must be regularly removed to that would normally be considered too small.
Ignitor tube the tipping chute hangs vertically from the screw it opens out outside of the burner. Burner auger Boiler front ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 6/32...
5 m for Biomatic+ 20 (6 m for Biomatic+ 30). If condensation water comes out of the flue, a condensate drain pan shall be installed in the lower portion of the...
Also the use of a safety switch (burner switch) is recommended. The other con- Ariterm Biomatic+ 20 and Biomatic+ 30 has been fitted with a factory wired 3-phase nection cable delivered with the burner is for boiler temperature and flue gas sensors.
Alarm (burner not in operation) Flashing: Warning light (does not switch off the burner) Service (-OFF) Browsing forward in the menu Browsing backward in the menu Increases the set values Decreases the set values ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 11/32...
OPERATINGMODE TEMPERATURE OPERATING TIME ignition element can be PELLETS STORE SERVICE be carried out by a service technician authorised by Ariterm. Flue gas analysis shall be PELLETS press plus key found. press plus key press plus key BOILER 55(80) °C...
Attention! Sometimes, when the burner is started for the first time, or if there are no pellets in the burner, a fire-start might be necessary after some 3 minutes operation. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 13/32...
“forward” to the next screen, if you want to view the pellets store data. Displays the number of operating days at the avera- Estimated time left For information only. ge consumption level in question. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 14/32...
Page 15
'no', and the burner will Is reset by pressing the Plus/Minus buttons si- Cold starts Displays the number of cold starts. keys always make cold start. (see also holding time) multaneously for 3 seconds. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 15/32...
ACTIONS CHART +20 ACTIONS CHART Biomatic+ 20 / BeQuem 20 version 0906 OPERATING TIME OPERATING TIME OPERATING TIME OPERATING TIME TOTAL ALARM PELLETS ESTIMATED TIME PELLETS STORE FEEDING FAKTOR CONSUMPTION CONSUMPTION AUGER EXTERNAL LEFT 0,0 t 0,0 kg/h AVERAGE 0,0 kg/d...
AUGER 0% FAN 2/h TIME 60min TIME 30s AUGER EXTERNAL HOT STARTS COLD STARTS SEQUENCE Press right arrow to leave menu. TIME MAN. 15min BURNER X BURNER X Not used! ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 17/32...
The feed opening of fuel must be loca- have been stuck in the silo. ted in the middle of the fuel store (app- lies to small week stores). ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 18/32...
No and, when necessary, should be repla- fuel has entered into the combus- ced by an authorised technician. tion head. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 19/32...
Burning solid fuels, even if operation is automated, normally calls for a little more care and maintenance than oil heating. For Biomatic+ 20/30 maintenance has been mini- mized as the result of well planned design and a big ash box holding 50 litres.
9. Emptying the ash is even easier with an ash proof container… cyclone, which works like a vacuum cleaner. It is important not to vacuum hot ash because of the fire risk. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 21/32...
Pellet fuel can be manufactured from several different biologically derived raw materi- This boiler manufactured by Ariterm AB is guaranteed to be free of defects in work- als. Most common is wood, but today there are several alternative materials available manship and materials for a period of 24 months (2 years) from the date of installa- on the market that are suitable for pellets manufacture.
The Feedo is particularly appropriate in combination with the NOTE! Installation of PS300 / Feedo, see separate manuals for each product. Depo discharge chute. NOTE! Installation of Depo / Feedo, see separate manuals for each product. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 23/32...
Page 24
FEEDING SYSTEM WEEKLY STORAGE ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 24/32...
Page 25
FEEDING SYSTEM DEPO / FEEDO ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 25/32...
Inst. date If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifications without prior notice. ARITERM SWEDEN AB Installation, Operation &...
Page 32
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 32/32...
Need help?
Do you have a question about the Biomatic+ 20 and is the answer not in the manual?
Questions and answers