Ariterm Bionet+ 12 Installation, Operation And Maintenance Manual

Advertisement

INSTALLATION, OPERATION AND MAINTENANCE
• Bionet+ 12
ARITERM SWEDEN AB
Installation, Operation & Maintenance -
2008.11.18- 1/28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bionet+ 12 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ariterm Bionet+ 12

  • Page 1 INSTALLATION, OPERATION AND MAINTENANCE • Bionet+ 12 ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 1/28...
  • Page 2: Table Of Contents

    Notes ..................24-26 Maintenance contract Installation Protocol...............27 Ariterm recommends the boiler installation to be made by a company with professio- nal competence. For more information please contact your Ariterm retailer. Replacing of spare parts Ariterm recommends that replacing of spare parts is made by authorized serviceman of Ariterm retailer.
  • Page 3: Dimensions / Items Included / Technical Specification

    DIMENSIONS / ITEMS INCLUDED IN THE DELIVERY Bionet+ 12 (art.nr 4037) Standard delivery • Shunt valve ESBE TM 20 • Sweeping gear • Combination flue for horizontal and vertical installation Accessories • Burner assembly kit • Shunt outlet Ø102 Kombinationsrökrör...
  • Page 4: Operating Principle

    OPERATING PRINCIPLE SAFETY AND ALARMS The Ariterm Bionet combines a compact pellet boiler with an Ariterm BeQuem The boiler is designed according to the same main principles as an oil heated system. combustion chamber into a single reliable and efficient unit. The convenience, envi-...
  • Page 5: Installations Example

    7b Indoor temperature sensor 8. Charging pump 9. Radiator pump Exp. 10. Safety relief valve vessel 11. Air bleeder valve 12. Pressure gauge 13. Expansion vessel 14. Storage tank BIONET Preheating ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 5/28...
  • Page 6: Wiring Diagram

    WIRING DIAGRAM ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 6/28...
  • Page 7: Burner Overview

    12. Auger tube 4. Primary ring 13. Burn pot 5. Airbox 6. Fan 14. Top coupling 15. Level monitor, receiver 7. Optical monitor tube 16. Burner skrew 8. Sluice gate ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 7/28...
  • Page 8: Installation

    Boiler cement is suitable for sealing. Recommended flue gas requirements for Closed system: Bionet+ 12: brick chimney lined with a Ø 100 mm acid proof thin-walled tube or an Select the volume of the vessel in accordance with the manufacturer’ s instructions.
  • Page 9: Filling Of Water

    Make sure to cut the power supply to the burner before servicing. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 9/28...
  • Page 10: Maintenance, Care, Sweeping

    Sintering is caused by impurities in the pellet fuel and a claim should be sent to the supplier at once. THE BURNER CUP MUST BE CAREFULLY CLEANED TO For more information please refer to ”Advice about Fuel Pellets”. ENSURE FLAWLESS OPERATION. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 10/28...
  • Page 11: Settings

    Fun must be in operation the desired end results. Adjustment is made with a flue gas analyser and should be before function of the carried out by a service technician authorised by Ariterm. Flue gas analysis shall be ignition element can be found.
  • Page 12: Start-Up In Off Mode

    (“desired temperature”), the burner redu- ces the power input to the burner in order to prevent shut down. If the lowest power input exceeds the building’ s requirements, the burner shuts off. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 12/28...
  • Page 13: Control Panel Layout

    Flashing: Warning light (does not switch off the burner) Browsing forward in the menu Reaching the menu Browsing backward in the menu level ”Service” Increases the set values Decreases the set values ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 13/28...
  • Page 14: Displayed Messages

    “forward” to the next screen, if you want to view the pellets store data. Displays the number of operating days at the avera- Estimated time left For information only. ge consumption level in question. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 14/28...
  • Page 15 Is reset by pressing the Plus/Minus buttons si- Default set vXXXX Cold starts Displays the number of cold starts. les resetting the factory settings. the Plus button. multaneously for 3 seconds. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 15/28...
  • Page 16: Actions Chart

    ACTIONS CHART ACTIONS CHART Bionet+ 12 / BeQuem 12 version 0821 OPERATING TIME OPERATING TIME OPERATING TIME OPERATING TIME TOTAL ESTIMATED TIME PELLETS STORE FEEDING FAKTOR CONSUMPTION ALARM PELLETS CONSUMPTION AUGER EXTERNAL LEFT 0,0 t 0,0 kg/h AVERAGE 0,0 kg/d...
  • Page 17: Troubleshooting

    The feed opening of fuel must be loca- have been stuck in the silo. ted in the middle of the fuel store (app- lies to small week stores). ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 17/28...
  • Page 18 No and, when necessary, should be repla- fuel has entered into the combus- ced by an authorised technician. tion head. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 18/28...
  • Page 19: Advice About Fuel Pellets

    Ariterm Sweden AB reserves the right to decide the method how a possible guarantee over 600 kg/m 3 Volume weight repair is carried out. Ariterm Sweden AB is not liable for damages occurred after the Moisture content less than 10 % expiration of the guarantee period, but compensation for such incidents may be agreed upon separately case by case.
  • Page 20: Feeding System

    The Feedo is particularly appropriate in combination with the NOTE! Installation of PS300 / Feedo, see separate manuals for each product. Depo discharge chute. NOTE! Installation of Depo / Feedo, see separate manuals for each product. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 20/28...
  • Page 21 FEEDING SYSTEM WEEKLY STORAGE ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 21/28...
  • Page 22 FEEDING SYSTEM DEPO / FEEDO ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 22/28...
  • Page 23: Feeding System

    FEEDING SYSTEM DEPO / FEEDO ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 23/28...
  • Page 24: Declaration Of Conformity

    NOTES DECLARATION OF CONFORMITY ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 24/28...
  • Page 25: Notes

    NOTES ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 25/28...
  • Page 26 NOTES ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 26/28...
  • Page 27: Installation Protocol

    Inst. date If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifications without prior notice. ARITERM SWEDEN AB Installation, Operation &...
  • Page 28 ARITERM SWEDEN AB Installation, Operation & Maintenance - 2008.11.18- 28/28...

Table of Contents