Ariterm Biomatic 50 Installation, Operation And Maintenance Manual

Ariterm Biomatic 50 Installation, Operation And Maintenance Manual

Advertisement

INSTALLATION, OPERATION AND MAINTENANCE
• Biomatic 50

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Biomatic 50 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ariterm Biomatic 50

  • Page 1 INSTALLATION, OPERATION AND MAINTENANCE • Biomatic 50...
  • Page 2: Table Of Contents

    Declaration of Conformity ............. 10 Installation Protocol ................ 11 Maintenance contract Ariterm recommends the boiler installation to be made by a company with professio- nal competence. For more information please contact your Ariterm retailer. Replacing of spare parts Ariterm recommends that replacing of spare parts is made by authorized serviceman of Ariterm retailer.
  • Page 3: Dimensions / Items Included

    DIMENSIONS / ITEMS INCLUDED IN THE DELIVERY Art.nr Ø 139 utv. Biomatic 50 (art.nr PELL-517010050) Standard delivery • Sweeping gear Accessories • Combination fl ue for horizontal and vertical installation (art.nr 5208) • Hot water heat exchanger • Assembly kit for oil burner...
  • Page 4: Operating Principle

    115 litres of water. Heat generated by the burner is transferred directly to the boiler water. Oil heating Th e Ariterm pellet boiler can also be used for heating with oil (oil heating accessories on demand). ARITERM SWEDEN AB...
  • Page 5: Wiring Diagram

    Control fuse 3 A, external circ. pump heating circuit Switch, external circ. pump, heating circuit On/Off Switch, internal circ. pump, hot water circuit, continous operation Regulating thermostat, burner High limit thermostat, burner ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 5/12...
  • Page 6: Control Panel

    fl ue. CAUTION! The boiler has low fl ue gas Mortar temperatures, which, under certain conditions,might lead to condensation of Flue pipe fl ue gases. 30 mm incom- bustible insulation ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 6/12...
  • Page 7: Water Piping

    An open system with 500 litre water volume demands at least a 35 litre expansion vessel and a 1500 litre system volume a 80 litre expansion vessel * System volume = boiler volume + storage tanks + piping volume + radiator volume. ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 7/12...
  • Page 8: Filling Of Water

    • Empty the ash. ATTENTION! Disconnect the power to the boiler before removing the protective housing ATTENTION! Show great care when emptying the ash as it can be glowing hot. ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 8/12...
  • Page 9: Advice About Fuel Pellets

    Study carefully the fuel performance after new delivery. can be used at a time. In case of doubt, please contact us at Ariterm. Th e store shall be well sealed to avoid the spreading of dust. As a guide when determi- •...
  • Page 10: Guarantee

    GUARANTEE DECLARATION OF CONFORMITY Th is boiler manufactured by Ariterm AB is guaranteed to be free of defects in work- manship and materials for a period of 24 months (2 years) from the date of installati- on. Th e manufacturer shall not be held liable for faults caused by incorrect installati- on, incorrect use, freezing, over-temperature or over-pressure.
  • Page 11: Installation Protocol

    If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifi cations without prior notice. ARITERM SWEDEN AB...

This manual is also suitable for:

Pell-517010050

Table of Contents