Ariterm Biomatic 20 Installation, Operation And Maintenance Manual

Ariterm Biomatic 20 Installation, Operation And Maintenance Manual

Advertisement

INSTALLATION, OPERATION AND MAINTENANCE
• Biomatic 20
ARITERM SWEDEN AB
Installation, Operation and Maintenance - 2007.10.26- 1/12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Biomatic 20 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ariterm Biomatic 20

  • Page 1 INSTALLATION, OPERATION AND MAINTENANCE • Biomatic 20 ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 1/12...
  • Page 2: Table Of Contents

    Guarantee Th is boiler manufactured by Ariterm AB is guaranteed to be free of defects in work- manship and materials for a period of 24 months (2 years) from the date of installati- on. Th e manufacturer shall not be held liable for faults caused by incorrect installati- on, incorrect use, freezing, over-temperature or over-pressure.
  • Page 3: Dimensions / Items Included

    606 x 717 x 1500 mm Dimensions Weight 220 kg Water contents 140 l Biomatic 20 1. Drain, hot water return line, DN 15 0,5-1,5 bar Design pressure, boiler max 10 bar 2. Flue connection Ø 102 Design pressure, cw-hw...
  • Page 4: Operating Principle

    Biomatic, the new generation pellet boiler, is specially designed for pellet burning; to reduce the formation of soot layers on the convection surfaces as far as Th anks to its modest dimensions Biomatic 20 can be installed in boiler rooms that possible, the boiler is equipped with upright convection tubes.
  • Page 5: Wiring Diagram

    WIRING DIAGRAM ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 5/12...
  • Page 6: Control Panel

    Indicates when electric heater is turned on. bustible 8. Switch - heat exchanger circulation pump insulation Press this button for continuous pump operation (to increase hot water capacity Imbedment into chimney during electric heater operation). ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 6/12...
  • Page 7: Water Piping

    5. Return line - radiator system 6. Hot tap water 7. Cold tap water 8. Shunt valve 9. Circulation pump – radiator circuit 10. Mixing valve – hot water circuit 11. Flow switch 12. Strainer ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 7/12...
  • Page 8: Filling Of Water

    Operating pressure is max. 1,5 Ariterm Biomatic 20 has been fi tted with a factory wired 3-phase 6 kW electric bar. Before taking the installation into service, and always at the beginning of the heating element.
  • Page 9: Maintenance, Care, Sweeping

    Most common is wood, but today there are several alternative materials available on the market that are suitable for pellets manufacture. and maintenance than oil heating. For Biomatic 20 maintenance has been minimized Th ese raw materials have various characteristics that can be advantageous or disad- as the result of well planned design and a big ash box holding 50 litres.
  • Page 10: Pellet Store

    2 x Ø 200 mm Slippery plywood board 16 mm Horizontal stud 50˚ 45x95 mm Store pipe (delivered by Ariterm), 2 x horizontal 80 mm see previous page. The whole length studs 45x95 mm of the store pipe shall be supported.
  • Page 11: Installation Protocol

    If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifi cations without prior notice. ARITERM SWEDEN AB...

Table of Contents

Save PDF