GENERAL INDEX
1.
1.1
ACKNOWLEDGEMENT LETTER.
2.
2.1.
USING THIS MANUAL.
2.1.1. Conventions and used symbols.
3.
3.1.
DECLARATION OF THE MANAGEMENT.
3.2.
STANDARD.
3.2.1. First and second environment.
3.2.1.1. First environment.
3.2.1.2. Second environment.
3.3.
ENVIRONMENT.
4.
4.1.
VIEWS.
4.1.1. Views of the equipment.
4.1.2
Legend corresponding to the equipment views.
4.2.
DEFINITION AND STRUCTURE.
4.2.1. Nomenclature.
4.2.2. Structural diagram.
4.3.
UPS FUNCTION STAGES.
4.3.1. I/O EMI filters.
4.3.2. Rectifier-PFC stage (AC/DC).
4.3.4. Inverter stage (DC/AC).
4.3.5. Static bypass stage.
4.3.6. Maintenance or manual Bypass.
4.3.7. Terminals for EPO.
4.3.9. Control software and communications.
4.3.9.2. Managing software of the equipment.
4.3.9.3. Communications.
4.4.
4.4.1. Normal operating (
).
4.4.2. Mains fault operating (
4.4.4. Manual bypass operating (
4.4.5. Smart ECO Mode operating (
4.5.
OPERATING STRUCTURE OF A PARALLEL SYSTEM.
5.
5.1.
RECEPTION OF THE EQUIPMENT.
5.1.1. Reception, packaging and contents.
5.1.2. Storage.
5.1.4. Location, immobilised and considerations.
5.1.4.1. Location for single equipments.
5.1.4.2. Location for parallel systems.
5.1.4.4. Preliminary considerations before connecting.
batteries and protections.
2
).
).
).
/
).
5.2.
CONNECTION.
5.2.1. Connection to mains, terminals (X1 to X4).
5.2.2. Connection of separate static bypass line, terminals (X14 a X17).
CUBE3+ B version only.
5.2.3. Connection to the output, terminals (X6 to X9).
5.2.4. Connection to the battery terminals of the equipment (X11, X12
and X23), with the battery modules (X47, X48 and X49).
the earth bonding terminal (X10) .
5.2.6. Relay COM port. Connector (X32).
5.2.7.1. RS232/RS485 COM 0 ports. Connector (X31).
5.2.7.2. COM or USB port. Connector (X31
5.2.8. EPO terminals (X50).
5.2.9.1. Terminal strip, auxiliary contact of manual bypass switch (X51).
5.2.9.2. Terminal strip, auxiliary contact of output switch (X45).
separate cabinet only.
5.2.9.4. Ethernet connectors (X34
cabinet. For separate battery cabinets and probe bundle > 5 m,
only.
5.2.10. Connection of parallel BUS (X36i) and (X36o).
6.
OPERATING.
6.1.
RELEVANT PRELIMINARY CONSIDERATIONS .
6.2.
UPS OR SYSTEM START UP.
6.2.1. Controls before starting up.
6.2.2. Start up procedure.
6.2.2.1. First start up procedure.
display.
6.3.
SHUTDOWN OF AN EQUIPMENT FROM PARALLEL SYSTEM.
6.4.
TO START UP THE UPS OF PREVIOUS SECTION.
6.5.
6.6.
EMERGENCY POWER OFF (EPO) BUTTON OPERATION.
6.7.
SMART ECO MODE OPERATING.
6.8.
6.8.1. Operating principle.
6.8.2. Transference to maintenance bypass.
panel.
6.8.4. Transference to normal operating, for equipments with touch
screen.
7.
7.1.
CONTROL PANEL PARTS.
7.2.
BASIC FUNCTIONS OF THE SYNOPTIC KEYPAD.
7.2.1. Messages menus and classification of the submenus.
7.3.
7.3.1. Main level (screen menu 0.0). See Fig 44.
7.3.2. ''CONTROL AND STATUS OF THE EQUIPMENT" level See Fig 45.
7.3.3. ''MEASUREMENT'' level (screen menu 2.0). See fig. 46.
7.3.4. ''PARAMETERS'' level (screen menu 3.0). See fig 47.
).
USB
) in the UPS and (X38
) in the battery
ETH
ETH
USER MANUAL
Need help?
Do you have a question about the SLC CUBE 3+ and is the answer not in the manual?
Questions and answers