Boiler Installation - Heatline SARGON 18S Installation, Servicing And User Instructions Manual

Pre-mix condensing system boiler
Table of Contents

Advertisement

10. Boiler Installation

10.1 Prior to installing the boiler check the contents of the carton: Appliance, Valves, Wall
Hanging Bracket, Mounting Template Service, Installation and User Manual, which includes
the Benchmark Log Book and Guarantee Card. The boiler dimensions are given in fi gure 10.
10.2 Ensure that the boiler is suitable for the gas supply by checking the data plate, which
is situated on the inside of the control panel door, and that the system and chosen boiler
position is in accordance to Sections 5, 6 and 7 of these instructions.
10.3 Position the supplied template on the wall, ensuring it is level both vertically and
horizontally. (fi gure 10) Mark the boiler wall bracket fi xing positions and fl ue outlet position
(rear fl ue only). For fl ue side exit from the boiler - Mark the horizontal fl ue centre line on the
rear wall. Extend the horizontal line to the side wall allowing a 3° decline back (if required,
see note below) towards the boiler, to enable condensate to drain back through the boiler.
Mark the fl ue centre vertical line. ( fi gure 11)
NOTE : Some fl ues may have the 3° built in and as such these fl ues may be installed in a
horizontal position.
A: 430 mm
B: 132 mm
15
Figure 9
Figure 10
TOP
BOTTOM
Figure 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sargon 30sSargon 24sSargon 20s

Table of Contents