Heatline SARGON 18S Installation, Servicing And User Instructions Manual page 36

Pre-mix condensing system boiler
Table of Contents

Advertisement

18.5 Printed Circuit Board (PCB)
Read the notes at the head of this section before commencing any work on the
appliance.
Remove interface cover by lifting the two latches. (fi gure 34)
Access the main PCB by opening the PCB cover.
NOTE the location of each plug before removing the electrical connections from
the PCB by releasing the clips and carefully pulling off the connectors.
Release the 4 screws securing the PCB to the control panel and lift out the PCB
Fit the replacement PCB in reverse order of removal, ensuring that the PCB electrical
connections are correctly located and fully pushed home.
18.6 Pump
Read the notes at the head of this section before commencing any work
on the appliance.
The order of removal is dependant on whether it is
the motor or body that has failed.
In case of motor failure:
Disconnect the screws connecting the pump head to the body, fi gure 35.
Pull off the pump head and disconnect the electrical connection from the cable
connection box of the pump, fi gure 36.
Figure 35
Figure 34
Figure 36
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sargon 30sSargon 24sSargon 20s

Table of Contents