Section 3. Installation Instructions; Materials And Tools; Installation Requirements; Figure 3. Installation Requirements - Jandy APURE35 Installation And Operation Manual

Aquapure ei series chlorine generating device dual voltage 240v/120v
Table of Contents

Advertisement

Page 10
Section 3.
Installation Instructions
FOR YOUR SAFETY: This product must be installed and serviced by a professional pool/spa service technician.
The procedures in this manual must be followed exactly. Failure to follow warning notices and instructions may
result in property damage, serious injury, or death. Improper installation and/or operation will void the warranty.
EQUIPMENT UNDER PRESSURE: Always turn pump off prior to installing or servicing the Jandy® AquaPure®
Ei chlorine generating device. Your pump/filter system is operated under pressure and the pressure must be
released before you begin work. Please see your pump/filter owner's manual for further instructions.
Before you begin your installation, please check that you have the right tools and a suitable location to install the
power pack and cell. Please ensure that you have read and understood the Important Safety Instructions section.

3.1 Materials and Tools

Installation Materials Furnished
• Pipe Spacer - for 1½ in. (40 mm) pipe
• Hole Saw
• Screw Set (includes wall plugs)
• Installation and Operation Manual

3.2 Installation Requirements

The Jandy AquaPure Ei chlorine generating device must be installed
horizontally with the cell above the pipe to avoid buildup of flammable
gases which can result in FIRE OR EXPLOSION.
The installation requirements for the Jandy AquaPure Ei chlorine
generating device are as follows:
• The power pack must be be installed at least 5 ft. (1.5 m) vertically off
the ground.
• In the US, the power pack must be be installed at least 5 ft. (1.5 m) from
the inside wall of your swimming pool or spa; in Canada, the power
pack must be be installed at least 10 ft. (3 m) from the inside wall of your
swimming pool or spa.
• The cell must be installed on a 1 ⅓ ft. (0.4 m) horizontal length
of pipe after the heaters, pumps, and filters, as the last piece of
equipment in the circulation plumbing system just before the pool (see
Figure 3).
• The cell must be installed no more than 15 ft. (4.6 m) from the power
pack (see Figure 3).
WARNING
WARNING
Tools Needed for Installation
• Cordless Drill (or Power Drill)
• 15/64 in. (6 mm) Hammer Drill Bit (only necessary to drill into
• Pencil or Marking Pen
• Phillips Head Screwdriver or Phillips Head Drill Bit
WARNING
brick or concrete)
Figure 3.
Power
Pack
15 ft. (4.6 m) MAX
Cell
Installation Requirements

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents