4. Open the required conduit knockouts according to the conduits used in the installation (refer to the
figure below for required knockouts; some of the knockouts may already be open but sealed): The
knockouts are located at the bottom and sides of the enclosure, each with two sizes: ¾'' and 1''. Open
the required knockouts, taking care not to interfere with any of the internal components. A Unibit
drill may be used.
NOTE
Unused conduit openings and glands should be sealed with appropriate seals.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.2
Figure 44: StorEdge Connection Unit knockouts
Appendix B: Opening Conduit Knockouts
97