DIP-Switch Setup - Two Powerwall1 Batteries
System Component
Meter
SolarEdge Meter
Inverter
Inverter communication board (Figure 22)
112
Communication and Termination Switches
External 120 Ohm termination on the last meter connected
on the RS485 chain
Termination:
If a meter is installed: SW7 Down - No termination
o
If a meter is not installed: SW7 Up - termination ON.
o
(see also Creating an RS485 Bus Connection on page 74)
Address Switches
Meter 1 address:
Switch 1: Up
o
Other: Down
o
Meter 2 address:
Switch 2: Up
o
Other: Down
o
N/A
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.2