IBM zEnterprise EC12 Installation Manual page 158

For physical planning 2827 all models gc28-6914-01 level 01f
Table of Contents

Advertisement

Level 01f
Figure 38. Frame tie-down hole cutouts 600 mm (23.5 in) floor tiles
Additional floor panel pedestals may be necessary to restore structural integrity to the raised floor after
making the circular cuts for the turnbuckles. Consult your flooring manufacturer for recommendations.
The remainder of the parts involved in any of the tie-down features include:
v New cable bars, fastened where the original cable trays were mounted
v A triangular support bar, hung on two hinges and secured with a vertical stop
v A latch for the triangular support bar
v A pair of stabilizer bars that rest on the raised floor between the corners of each frame
v Four turnbuckle assemblies with fastening hardware that extend through the raised floor and are
secured to the eyebolts
v Heavier cover door latches.
These additional tie-down parts are installed along with the server. The installation instructions are
included as an appendix in the zEnterprise EC12 Installation Manual, which is shipped with the server.
144
zEC12 IMPP