IBM zEnterprise EC12 Installation Manual page 14

For physical planning 2827 all models gc28-6914-01 level 01f
Table of Contents

Advertisement

Level 01f
Table 1. Summary of changes (continued)
Release Level
00b
10/2012
00a
09/2012
xii
zEC12 IMPP
Date
Changes in Level
This revision contains editorial changes and the following technical changes:
v Changed the order number for the System z Planning for Fiber Optic Links
(FICON/FCP, Coupling Links, and Open System Adapters) document from
GA23-1353 to GA23-1406.
v Added relative humidity information to Table 2 on page 12.
v Updated the BTA information in "Water specifications" on page 54.
v Removed feature codes 4022, 4024, 4025, and 4026 from the Table 19 on page
67.
This revision contains editorial changes and the following technical changes:
v In the "Weight distribution" on page 33 section:
– Updated the weight values in Table 7 on page 33 and Table 8 on page 33.
– Updated the floor loading data in four tables.
v In the "System weight examples" on page 37 section, updated the values in
Table 9 on page 37.
v In the "Customer circuit breakers (CBs)" on page 73 section, corrected the
circuit breaker value for 380-415 VAC.
v In the "Power plugs and receptacles" on page 77 section, added supported
power cord feature codes to the table.

Advertisement

Table of Contents
loading

Table of Contents