IBM zEnterprise EC12 Installation Manual page 148

For physical planning 2827 all models gc28-6914-01 level 01f
Table of Contents

Advertisement

Level 01f
|
Example 1 (redundant distribution panel and switch gear)
In this example, the computer receives power from four separate power distribution panels. The four
|
distribution panels receive power from two pieces of building switch gear.
|
|
This type of power distribution will not result in system outage in the event of a power failure at either
|
switch gear or one of the distribution panels. IBM recommends this power distribution to achieve highest
availability.
|
Distribution
Switch Gear
Distribution
Distribution
Switch Gear
Distribution
134
zEC12 IMPP
J01 - Rear BPE
J02 - Rear BPE
Panel
P01 - Rear BPE
P02 - Rear BPE
Panel
Panel
J01 - Front BPE
J02 - Front BPE
Panel
P01 - Front BPE
P02 - Front BPE

Advertisement

Table of Contents
loading

Table of Contents