IBM zEnterprise EC12 Installation Manual page 157

For physical planning 2827 all models gc28-6914-01 level 01f
Table of Contents

Advertisement

Level 01f
Regardless of which kit you need, the following figures show where to cut the floor panels for the
turnbuckles to pass through to the eyebolts set in the concrete floor beneath.
Figure 37. Frame tie-down hole cutouts 610 mm (24 in) floor tiles
143
Appendix F. Frame tie-down

Advertisement

Table of Contents
loading

Table of Contents