Processor Unit - Furuno FCR-2139S-BB Installation Manual

Chart radar
Hide thumbs Also See for FCR-2139S-BB:
Table of Contents

Advertisement

1. MOUNTING
1.5

Processor Unit

1.5.1
Mounting considerations
When you select a mounting location, keep in mind the following points:
• Locate the processor unit away from heat sources because of heat that can build
up inside the cabinet.
• The vibration at the mounting location should be minimum.
• Locate the equipment away from places subject to water splash and rain.
• Make the service clearance of 100 mm in front of the vent hole (left side).
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• Make sure that the ground wire is connected between the earth terminal on the
chassis and the ship's earth.
• A magnetic compass will be affected if the processor unit is placed too close to the
magnetic compass. Observe the compass safe distances on page ii to prevent com-
pass malfunction.
• Do not remove the dummy plate to prevent the wrong operation of the power switch.
The items behind the plate are for use by the serviceman.
Processor unit, front view
• Mount the processor unit on the floor, or on a bulkhead with the following direction
(horizontal), because of the DVD drive unit.
OK
1-12
Keep the dummy
plate in this
position.
UP

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcr-2839s

Table of Contents