Dnp / Iec104 Point Lists - GE 850 Instruction Manual

Feeder protection system/feeder protection and control
Hide thumbs Also See for 850:
Table of Contents

Advertisement

DEVICE
DNP / IEC104 Point
Lists
4–42
The menu for the DNP/IEC104 point lists is shown below.
Path:
Setpoints > Device > Communications > DNP/IEC104 Point Lists
The binary inputs points for the DNP protocol, or the MSP points for IEC 60870-5-104
protocol, can be configured to a maximum of 96 points. The data source for each point is
user-programmable and can be configured by assigning FlexLogic operands.
The menu for the binary input points (DNP) or MSP points (IEC 60870-5-104) is shown
below.
Path:
Setpoints > Device > Communications > DNP/IEC104 Point Lists > Binary Input/MSP
Points
..\DNP / IEC104 Point Lists\Binary Input / MSP Points
Item Name
Point 0 Entry
Point 95 Entry
IP Points
Up to 32 analog input points can be configured for the DNP or IEC 60870-5-104 protocols.
The menu for the analog input point (DNP) or MME points (IEC 60870-5-104) is shown
below.
Value
Unit
Off
Off
850 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 4: SETPOINTS

Advertisement

Table of Contents
loading

Table of Contents