Pdm Installation - Powerware 9125 Installation Manual

9910 p30
Hide thumbs Also See for 9125:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7

PDM Installation

The following steps explain how to install the optional FC 6570 PDM.
NOTE
®
Powerware
9125 (9910 P30) Installation Guide for IBM
4.
Attach the fixed cover plate (supplied in the EBM accessory kit) to the EBM cable as
shown in Figure 18.
EBM Cable
EBM Cable with
Fixed Cover Plate
EBM Battery
Connector
with Cover
5.
If additional EBMs are to be installed, remove the EBM battery connector cover.
Remove the cover from the EBM cable of the second cabinet and plug the EBM cable
into the battery connector on the first EBM. Attach the fixed cover plate to the EBM
cable.
Repeat for each additional EBM. Up to four EBMs may be connected to the UPS.
6.
Continue to the following section, "PDM Installation" or "Power Cord Connections" on
page 12.
1.
Verify that the Bypass switch on the PDM is in the NORMAL position (see Figure 19).
2.
Select the input voltage (208 or 240V) using the Voltage Selector Switch according to
the utility voltage:
Utility voltage 200–208V, select 208V
Utility voltage 220–240V, select 240V
The output of the PDM is 120/240V while the UPS and utility inputs are 200–240V.
3.
Verify that the power cord provided with the IBM equipment is detached from the UPS
input connector. Retain the cord for future use.
4.
Connect the jumper cable (provided in the PDM accessory kit) from the 16A UPS
output receptacle into the UPS-output connector on the PDM.
5.
Plug the attached PDM-to-UPS cord into the input connector on the UPS rear panel.
Applications S 164201544 Rev A Final 29-Jun-2004
®
Fixed Cover Plate
Figure 18. Typical EBM Installation
P30 Installation Guide
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents