Powerware 9125 Installation Manual page 10

9910 p30
Hide thumbs Also See for 9125:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7
P30 Installation Guide
The following steps explain how to install the UPS rail kit.
NOTE
rail hardware kit.
NOTE
4
All hardware (screws, clip nuts, etc.) referenced in Steps 2 through 4 are contained in the
1.
Loosen the assembly wing nuts on both rail assemblies and adjust the rail size for the
depth of your rack (see Figure 1).
Rear Hold-Down Bracket
Rear
2.
Select the proper holes in the rail for positioning the UPS and any optional cabinets in
the rack.
3.
Secure both rails to the front of the rack with pan-head screws. Insert the screws
through the center holes of the rail (see Figure 2).
Do not tighten the screws until the UPS or EBM is installed.
4.
Using two clip nuts and two pan-head screws, attach the rail to the rear of the rack
(see Figure 3 and Figure 4).
The bottom rail uses position 2 and 4 for the rear hex-head screws. If you are installing
additional rails, the next rail should be placed 4 holes above the last installed screw.
®
Powerware
9125 (9910 P30) Installation Guide for IBM
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
Figure 2. Securing the Front Rail
Applications S 164201544 Rev A Final 29-Jun-2004
®
Front

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents