Powerware 9125 Installation Manual page 15

9910 p30
Hide thumbs Also See for 9125:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7
NOTE
required for all tower EBM installations.
®
Powerware
9125 (9910 P30) Installation Guide for IBM
Pedestals are required for one and two cabinet installations. Joining brackets are
9.
Align each joining bracket with the adjacent corner screw holes and secure with the
supplied screws (see Figure 15).
Joining Bracket
Figure 15. Installing the Joining Brackets (Top View with Pedestals)
10.
If installing additional EBMs, repeat Step 9 for each cabinet and continue to the
following section, "EBM Installation;" otherwise, continue to "PDM Installation" on
page 11 or "Power Cord Connections" on page 12.
Applications S 164201544 Rev A Final 29-Jun-2004
®
Figure 14. Tower Setup with Three Cabinets
UPS
EBM
or PDM
P30 Installation Guide
Air Vents
Joining Bracket
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents